MEPCO Net Metering 2025
Net metering is a special way of billing that lets people make their own electricity using solar energy. When you create more power than you use, the extra energy goes back into the national grid, and you earn credits for it. In Pakistan, net metering is becoming popular because it helps lower electricity costs and meets the growing need for energy.
Net metering is especially useful in Pakistan because we have a lot of sunlight all year round, making solar energy very accessible. By using solar panels, families and businesses can save money on their electricity bills while also helping the environment.
In this article, we will look at the benefits of net metering, who can apply for it, how to apply, and what the tariff rates are for MEPCO net metering in Pakistan.

Why to switch to Net Metering?
1. Financial Savings
One of the primary advantages of MEPCO net metering is the potential for significant financial savings on electricity bills. By generating their own electricity, consumers can offset their energy costs. When solar panels produce more energy than is consumed, the excess electricity is credited against future bills, leading to reduced overall expenses. This is particularly beneficial for households and businesses that face high energy costs.
2. Promotion of Renewable Energy
The MEPCO net metering system supports the government’s efforts to promote renewable energy in Pakistan. By encouraging individuals and businesses to invest in solar energy systems, MEPCO is playing a crucial role in increasing the share of clean energy in the country’s energy mix. This transition helps reduce greenhouse gas emissions and mitigates climate change impacts.
3. Energy Independence
Net metering provides consumers with greater control over their energy sources, allowing them to become less reliant on traditional electricity suppliers. This independence is particularly valuable in a country like Pakistan, where electricity shortages and rising tariffs are common. By generating their own electricity, consumers can protect themselves from price fluctuations and ensure a more stable energy supply.
4. Support for Local Economies
As more consumers adopt solar energy systems, local businesses involved in solar panel installation and maintenance benefit from increased demand. This creates jobs and stimulates economic growth in the renewable energy sector.
Eligibility and Requirements for MEPCO Net Metering
To participate in the MEPCO net metering program, consumers must meet specific eligibility criteria and provide necessary documentation.
Eligibility Criteria
- Connection Type: Applicants must have a three-phase electricity connection.
- Consumer Category: Net metering is available for residential, commercial, and industrial consumers.
- Solar PV Capacity: The installed solar power system must range between 1 kW to 10 MW, ensuring that it can effectively contribute to the grid without overloading it.
Required Documents
To apply for MEPCO net metering, consumers need to prepare the following documents:
- Application Form: Completed application according to MEPCO’s specified format.
- Copy of CNIC: A photocopy of the applicant’s Computerized National Identity Card (CNIC), attested for verification.
- Latest Electricity Bill: A copy of the most recent electricity bill to establish current consumption levels.
- Technical Specifications: Documentation outlining the technical specifications of the solar PV system and inverter.
- Single Line Diagram: A diagram illustrating the electrical setup.
- No Objection Certificate (NOC): Issued by an electric inspector, confirming compliance with local regulations.

Net metering application process
Applying for MEPCO net metering involves a multi-step process designed to ensure that installations meet regulatory standards and consumer needs. Here’s a step-by-step guide:
Step 1: Install a Solar System
Before applying for net metering, consumers must first have a compliant solar energy system installed. It’s advisable to engage a registered solar company to ensure proper installation and adherence to MEPCO standards.
Step 2: Prepare Documentation
Gather all required documents, ensuring that they are accurate and complete. Missing or incorrect information can delay the application process.
Step 3: Submit the Application
Submit the application along with the necessary documents to MEPCO. Ensure that all documentation is properly filled out to avoid rejections.
Step 4: Inspection
Once the application is received, MEPCO will schedule an inspection of the installed solar system. Officials will assess the setup to ensure it meets technical and safety standards.
Step 5: Issuance of NOC
If the inspection is successful, MEPCO will issue a No Objection Certificate (NOC), allowing the consumer to proceed with the net metering agreement.
Step 6: Sign Agreement
Upon receiving the NOC, consumers will sign an agreement with MEPCO that outlines the terms and conditions of net metering services.
Step 7: License Verification
MEPCO will forward the agreement to NEPRA (National Electric Power Regulatory Authority) for licensing. Once approved, consumers will receive a generation license, allowing them to sell excess electricity back to the grid.
Step 8: Installation of Net Meter
Finally, MEPCO will install a bi-directional meter that tracks both electricity consumed and generated. This smart meter allows for accurate billing and crediting for any excess energy exported to the grid.
Tariff Rates for Net Metering with MEPCO
Understanding the financial implications of net metering is crucial for potential participants. The current tariff rates for net metering in Pakistan, as outlined by MEPCO, are as follows:
- Residential Users: The buyback rate is approximately PKR 18.64 per unit.
- Commercial Users: The buyback rate stands at about PKR 22.20 per unit.
- Industrial Users: The rate is approximately PKR 11.30 per unit.
These rates are designed to encourage users to invest in solar energy systems by offering competitive compensation for the electricity they contribute to the grid.
CHECKLIST FOR FILING MEPCO NET METERING APPLICATIONS
- In case of NET Metering, Installation of Solar system is only allowed from AEDB approved Installers/vendors.
- Upgrade your Connection Type: 3 Phase & Load applied for DG Facility can be equal 1.5 times than load Sanctioned Ranging between 01 Kw to 1000 Kw
- Distributed Generation Interconnection Agreement between Distributed Generator and Distribution Company (Schedule-I).
- Standard Distributed Generation Application Form For Distribution Company (Schedule-II).
- Application for grant of License National Electric Power Regulatory Authority (NEPRA) (Schedule-III).
- Application for Exemption from section 24 of the Act (Schedule-IV)
- Fee Schedule (Schedule-V).
- Affidavit (On non-judicial paper) (Schedule-VI).
- Generation License Template (Schedule-VII).
- Attested copy of CNIC of Applicant and Witnesses from applicant.
- Copy of last paid electricity bill. (Name of applicant and name mentioned on electricity bill must be same).
- Technical Data of components including solar modules, invertors, etc.
- Schematic drawings, Single line diagram of the system.
- Site plan showing location of external disconnect switch.
- Certificate from Electrical Inspector if DG facility is Above 250 KW.
- Load Flow Study if DG Facility is greater than 250 KW.
- Installation/Inspection Certificate of Electrical Installations from Installers/ AEDB approved vendors.
- In case of company, CUIN certificate is required.

FAQ’s
Conclusion
MEPCO net metering presents a valuable opportunity for electricity consumers in Pakistan to harness solar energy, reduce their electricity costs, and contribute to a more sustainable future. By understanding the eligibility requirements, application process, and tariff rates associated with net metering, consumers can make informed decisions about adopting solar solutions.
As Pakistan continues to face energy challenges, net metering serves as a step towards a greener, more independent energy landscape. If you’re considering solar energy for your home or business, MEPCO’s net metering program is a viable and beneficial option worth exploring.
One Comment